Bradley County TN Manufactured Home Site Sketch: $50 Permit & TDEC Checklist

Manufactured home dealers, mobile home retailers, and set crews delivering into Cleveland, Charleston, and unincorporated Bradley County run into an important distinction right at intake: Bradley County separates a site sketch (used for $50 Mobile/Manufactured Home Permits) from an engineered site plan (triggered by commercial work, multifamily builds, or disturbing 1+ acre). Even so, deals stall when a sketch leaves out drives, decks, or existing structures, when TDEC septic proof isn't on file first, or when crews go to the wrong counter for Cleveland Utilities electrical and plumbing permits. Load your buyer's parcel into SitePlans.ai, draft a clean Bradley County TN manufactured home site sketch in minutes, and keep deliveries on schedule.

Bradley County TN manufactured home site sketch showing parcel boundary, home footprint, driveway, deck, and existing structures
A plat-style preliminary site sketch prepared for a Bradley County $50 Mobile/Manufactured Home Permit, displaying drives, decks, and existing structures.

Jump To The Permit Details That Matter

In unincorporated Bradley County and the City of Charleston, Tennessee, the Planning & Inspections Office (155 Broad Street NW, Cleveland, TN 37311) issues a $50.00 Mobile/Manufactured Home Permit requiring the Map-Group-Parcel number, State-required Mobile Home Installer information, TDEC septic proof on file before permit issuance, and a plat-based Site Sketch showing the new structure, drives/paved areas, decks, pools, and existing buildings. Manufactured home placements do not require an engineered site plan unless they cross land-disturbance thresholds (1+ acre disturbed, grade altered over 2 feet, or roads/walls/drains added; 2026 land-disturbance fee is $100 for the first acre plus $50 per additional acre). Properties served by Cleveland Utilities purchase electrical and plumbing permits from the City of Cleveland (185 2nd Street NE); all others purchase electrical permits from the State at core.tn.gov. Installers must also buy a $45.00 state installation decal from the county clerk before setup and report within 7 days. SitePlans.ai helps dealers draft preliminary site sketches in minutes ($49 single plan, $69/mo Contractor Pro, or $499/mo Home Dealer); it does not replace a licensed Tennessee RLS survey or PE-engineered stormwater plan where triggered.

Bradley County TN Manufactured Home Site Sketch: $50 Permit & TDEC Checklist

Prepare a Site Sketch from APN in Minutes → Purchase a Permit-Ready Non-Certified Plan →


Site Sketch vs. Site Plan: What Bradley County Actually Requires

Many out-of-county dealers overcomplicate Bradley County quotes by telling buyers they need a full engineered site plan for a single-wide or double-wide placement. Bradley County draws a sharp line between the two documents:

  • Site Sketch (Manufactured Home Permits): Required for the $50.00 Mobile/Manufactured Home Permit issued by the Planning & Inspections Office (155 Broad Street NW, Cleveland, TN 37311, Courthouse Annex basement—covering unincorporated Bradley County and the City of Charleston). County guidance notes it is best drawn on a copy of the property's plat and must show the new home location, drives/paved areas, decks, pools, and any other structures on the parcel.
  • Engineered Site Plan (Major Disturbance / Commercial): Required only for multifamily, commercial, industrial, or major land-disturbance scopes—triggered when disturbing 1 acre or more, altering grade by more than 2 feet, constructing roads, sidewalks, retaining walls, drains, sewer lines, or parking lots, or changing stormwater flow. Under the January 2026 stormwater schedule, Land Disturbance Permits cost $100 for the first acre plus $50 per additional acre (plus a separate TDEC permit at 1+ acre).

Building your Bradley County TN manufactured home site sketch in SitePlans.ai gives your sales desk a clean, scaled layout in minutes without paying survey or engineering rates on standard placements.


Five Pre-Delivery Gates Dealers Must Clear in Bradley County

RequirementVerified Bradley County / TN RuleWhere Dealers Get Delayed
1. TDEC Septic Proof FirstPublic sewer proof, existing-system Certificate of Verification, or online new-system applicationA copy of the TDEC document must be on file with Bradley County before the building permit issues.
2. Map-Group-Parcel & Installer InfoAssessor Map-Group-Parcel number + State-required Mobile Home Installer details + owner/agent signatureMissing installer credentials or parcel IDs halt intake at the Courthouse Annex.
3. Cleveland Utilities SplitCleveland Utilities customers buy electrical & plumbing permits from City of Cleveland (185 2nd St. NE)Non-Cleveland Utilities lots buy electrical permits via core.tn.gov; county requires no separate MH plumbing permit outside Cleveland Utilities.
4. $45 State Installation DecalPurchased from the county clerk before setup ($8 clerk / $37 state) under TN Code § 68-126-406Decal goes inside the electrical panel cover—inspectors block power if missing. Installer reports within 7 days.
5. Unverified Local DetailsUnincorporated MH setback tables, sketch scale standards, and permit turnaround times are not published onlineConfirm any parcel-specific setbacks or sketch formatting questions directly with Planning & Inspections before delivery.

Built for Bradley County Dealers, Installers & Builders


Permit Project Types Covered Across Bradley County


How to Build Your Bradley County Site Sketch with Our Tools

  1. Pull the parcel with Select Parcel. Enter the buyer's address or Map-Group-Parcel reference to load lot lines (or trace directly from the recorded plat if rural boundaries do not load automatically).
  2. Use our AI site plan assistant to stage existing conditions. Guide the assistant to outline the main house, existing sheds, pools, and paved drives in seconds instead of drawing every polygon by hand.
  3. Place the manufactured home, decks, and drives with Create Dimensions and Generate Setbacks. Verify spacing between the home, existing structures, and drives so reviewers see every required element clearly.
  4. Organize callouts with Manage Layers and Clean Property Line Labels. Toggle reference layers cleanly so parcel dimensions and Map-Group-Parcel labels stay readable.
  5. Finalize your title block and Export PDF. Print or save a clean scaled sheet ready to pair with your TDEC septic document and $50 permit packet.

Pricing for Bradley County Dealers & Set Crews

PlanBest ForWhat You Get
Single Plan ($49)One-off MH placement or deck/driveway sketchFull canvas editing, AI assistant staging, and PDF export.
Contractor Pro ($69/mo)Local set crews and deck/site-prep contractorsRepeat monthly jobs, fast revisions, and branded title blocks.
Builder Plus ($299/mo)Multi-lot infill buildersHigh-volume monthly project capacity across Southeast Tennessee.
Home Dealer ($499/mo)Multi-county manufactured & mobile home sales desksTeam-wide sales-desk lot sketches across Bradley, Hamilton, and Marion counties.
Done-For-You (SitePlans.us)Busy sales desks or complex 1+ acre tractsHuman-reviewed, non-certified preliminary layouts delivered in 4 to 24 hours.

What SitePlans.ai Does Not Replace

SitePlans.ai helps dealers and contractors create preliminary, permit-style site sketches where local rules allow applicant-prepared drawings. It is not a licensed Tennessee RLS boundary survey, TDEC septic engineering approval, PE-sealed stormwater/land-disturbance plan (required at 1+ acre or >2 ft grade changes), or a guarantee of permit approval. Confirm current setback rules and sketch acceptance directly with Bradley County Planning & Inspections.


Nearby Counties


Official Bradley County & Tennessee Resources

Frequently asked questions

Does Bradley County require an engineered site plan for a manufactured home permit?

No. Bradley County distinguishes between a plat-based Site Sketch (required for the $50 Mobile/Manufactured Home Permit) and an engineered Site Plan (triggered only for multifamily, commercial, industrial, or major land disturbance such as 1+ acre or >2 ft grade changes).

What must appear on a Bradley County manufactured home site sketch?

Bradley County states the site sketch is best drawn on a copy of the property's plat and must include the location of the new structure, drives/paved areas, decks, pools, and any other structures on the parcel.

Where do dealers and installers buy electrical and plumbing permits in Bradley County?

If the parcel is served by Cleveland Utilities, electrical and plumbing permits are purchased from the City of Cleveland (185 2nd St. NE). All other parcels purchase electrical permits through the State at core.tn.gov, and Bradley County does not require a separate MH plumbing permit outside Cleveland Utilities.

Do I need TDEC septic approval and a $45 state decal in Bradley County?

Yes. A copy of the TDEC septic document (public sewer proof, existing-system Certificate of Verification, or new-system application) must be on file before Bradley County issues the building permit, and the installer must buy the $45 state installation decal from the county clerk before setup.