Manufactured Home Placement Site Plans: Clear County Zoning Before the Transport Rig Leaves the Lot
Load a Job Address → Get a Done-For-You Plan →
Create the Placement Site Plan Your Crew Needs for This Permit
Before your set crew levels piers or pulls transport permits, the county zoning or land-use desk wants visual proof on paper that your manufactured home legally fits the dirt. A manufactured home placement site plan answers four questions plan reviewers check in their first five minutes: how far the box sits from every lot boundary, how far it stands from public roads or road centerlines, whether existing buildings or easements pinch the pad, and whether domestic wells and septic drainfields keep mandatory separation.
County review logs show how fast minor drawing omissions escalate into multi-week bottlenecks:
- In Yakima County, WA, published 2024 permit records (MHP2024-00005) caught conflicting distances between two dwellings and flagged the file for a plan revision aligning both houses to the east property line—alongside mandatory measurements back to road centerlines at scales like
1/4" = 10'. - In Grant County, WA, site plans are mandatory across all projects, capped at 11" × 17" using standard 1"=20' / 30' / 40' / 50' engineering scales, and rejected at intake unless uploaded specifically named
"Site Plan". - In Coconino County, AZ, the placement file under "04. Manufactured and Factory-Built Site Plan Review" cannot issue until an approved wastewater NOI permit is already active—turning unvetted unsewered lots into silent deal-killers.
- In La Paz County, AZ and San Joaquin County, CA, reviewers inspect every existing shed, leach field, reserve drainfield, well, creek, desert wash, and utility easement before signing off on placement geometry.
Load your client's job address directly inside our drafting workspace to frame lot lines, verify setbacks at the sales counter, and keep every redline fix in-house.
Built for Repeat B2B Teams Permitting Manufactured Placements
- Manufactured home retailers and manufactured home dealers qualifying single-wide, double-wide, and triple-wide sales across rural and suburban counties before assigning delivery dates or locking factory build slots.
- Mobile home retailers and mobile home dealers checking lot dimensions, park vs. private-parcel zoning setbacks, wash clearances, and existing utility hookups prior to moving inventory.
- Modular home retailers and modular home dealers comparing HUD-code placement checklists against Factory-Built Building routes when buyers weigh manufactured vs. modular floor plans for the same tract.
- Contractors coordinating site prep, grading, driveway approaches, decks, garages, sheds, patios, and fences tied to new lot placements.
- Builders and commercial real estate groups planning multi-lot infill acquisitions, rental community pad layouts, or accessory housing alongside primary residences such as ADUs, additions, or pools.
What County Plan Checkers Expect on a Placement Site Plan
Use this core field checklist before exporting any HUD-code placement sheet:
| Drawing Element | Exact Details Reviewers Look For | Typical Redline Failure When Missing |
|---|---|---|
| Parcel Boundary & Identity | Property owner name, assessor parcel number (APN), lot lines & bearings/dimensions | Unmatched APNs or missing corner dimensions bounce intake review on day one. |
| Scale & Orientation | North arrow + verified scale (1/4"=10', 1"=20', 1"=30', 1"=40', or 1"=50'), sized cleanly (e.g., max 11" × 17" where specified) | "Not to scale" sketches fail zoning verification immediately. |
| Adjacent Streets & Centerlines | Public/private road names, right-of-way edges, and road centerline offsets | Front-edge measurements alone get kicked back in counties enforcing centerline setbacks. |
| Proposed & Existing Structures | Accurate HUD-code box size (length × width + hitches/projections), plus every existing house, barn, shed, or outbuilding | Omitting an existing shop or mismatching structure-to-lot-line distances triggers formal holds. |
| Zoning Setbacks & Easements | Front/side/rear setback lines + all recorded access, irrigation, and utility easements | Catching an easement overlap after pouring piers stalls final inspection. |
| Wells, Septic & Reserve Fields | Domestic well casing, septic tank, leach trenches, 100% septic reserve area, and separation distances | Environmental Health refuses placement clearance without sanitary buffers mapped clearly. |
| Waterways, Slopes & Propane | Floodplains, desert washes, streams, irrigation canals, retaining walls, and propane tanks | Rural western counties explicitly gate placements on wash and LP tank offsets. |
| Driveway & Access Approach | Clear driveway alignment connecting the county/city road to the home parking pad | Missing approach geometry delays right-of-way and fire turnaround sign-off. |
Placement Plan vs. Installation & Companion Job Pages
Keep your sales desk, installers, and civil subs aligned across every project scope by connecting placement drawings with downstream installation and exterior permit pages:
| Home Type / Trade Scope | Placement Planning Page | Installation & Execution Page | When Crews Switch From One to the Other |
|---|---|---|---|
| HUD-Code Manufactured Homes | Manufactured Home Placement Site Plan (This Page) | Manufactured Home Installation Site Plan | After county zoning/placement approves the lot footprint and state installation/pier packets begin |
| Modular / Factory-Built (FBB) | Modular Home Placement Site Plan | Modular Home Installation Site Plan | When transitioning from pre-submittal zoning/FBB check to permanent foundation & state inspection close-out |
| Mobile & Relocatable Units | Mobile Home Placement Site Plan | Mobile Home Installation Site Plan | When confirming Pre-HUD / park eligibility before blocking, skirting, landings, and utility tie-ins |
| Exterior Site Additions | — | Driveway, Deck, Garage, Shed | Whenever counties inspect entry steps, landings, carports, or sheds separately from the box |
How Fast In-House Placement Drawings Eliminate Dealer Holding Costs
When your dealership outsources placement plots to an outside CAD drafter, you inherit three hidden margin leaks: five-day intake queues, fresh billing every time a buyer switches from a 28×60 to a 28×68 floor plan, and frozen transport schedules whenever a county examiner requests a two-foot setback tweak.
Drafting placement site plans inside your own browser fixes that pipeline:
- Vet buyer land before signing purchase agreements. Run the lot address at the sales desk to confirm septic buffers, washes, and easements actually leave room for the chosen footprint.
- Swap floor plans in seconds. Need to flip orientation 90 degrees or widen a covered porch before submittal? Update the existing project file cleanly without paying a drafter twice.
- Send county redlines back the same afternoon. Open the saved project, shift the box or update road centerline callouts, and export a clean title-blocked PDF before county review queues reset.
Step-by-Step: Draft a Manufactured Home Placement Site Plan From Any Address
- Enter the job address and confirm parcel coverage. Launch
/#checkerto pull property boundary data in live-covered counties—or submit the lookup to request rapid county coverage activation (or commission human drafting via SitePlans.us). - Select your parcel and orient north clearly. Verify parcel ID numbers, adjacent street names, and boundary segments against county GIS or assessor records.
- Add proposed and existing structures. Drop the exact manufactured home box dimensions plus every existing residence, garage, shed, and utility pad on the lot.
- Generate setbacks and road centerline offsets. Overlay front, rear, and side zoning envelopes, and measure both to property edges and adjacent road centerlines where local codes enforce centerline offsets.
- Label septic systems, wells, easements, and create dimensions. Add crisp dimensional callouts between structures, reserve fields, driveways, and lot lines so reviewers verify spacing visually without calculator guesswork.
- Export PDF with your dealership or builder title block. Output clean Letter or engineered sheet PDFs named accurately (such as
"Site Plan") ready for county portal upload.
What This Doesn't Replace
Our browser workspace generates preliminary, conceptual, permit-style site plans designed for manufactured home dealers, builders, and site contractors where counties accept applicant-prepared scaled placement drawings. It is not a licensed land boundary survey, a PE- or architect-sealed foundation or tie-down structural drawing, a certified health-district septic design or percolation test, a floodplain elevation certificate, a state HUD/housing installation permit, or a guarantee of permit issuance. Whenever local ordinances, disputed lot pins, or slope conditions demand licensed surveys or engineered stamps, those certified deliverables remain mandatory.
Comparing Manufactured Home Placement Drawing Workflows
| Workflow | Turnaround per Lot | Cost per Floor-Plan Swap or Redline Edit | Ideal Stage in Placement Lifecycle | Typical Cost |
|---|---|---|---|---|
| Licensed Land Surveyor | 2–6 weeks | High hourly billing | Boundary pin disputes, legal lot splits, strict survey-mandatory counties | \$1,200–\$3,500+ |
| Outside CAD Drafter | 3–10 business days | Paid change-order fee + wait | Single one-off lots with no buyer floor-plan changes | \$200–\$500 / lot |
| SitePlans.ai (In-House Workspace) | 10 minutes | Included inside monthly plan exports | Pre-contract lot vetting, county placement submittals & same-day redlines | \$13.80–\$49 / plan |
| SitePlans.us (Done-For-You) | Fast human turnaround | Handled directly by drafting staff | Odd-shaped rural tracts or team overflow weeks | Per-project flat rate |
Pricing Built for Contractors, Builders & Multi-Lot Home Dealers
| Plan | Price | Unit Cost | Best For | What You Get |
|---|---|---|---|---|
| Single Site Plan | \$49 | \$49.00 / plan | One-off permit job | 1 saved project, up to 3 address lookups, up to 5 PDF exports (includes redline edits), Letter landscape title sheet, editable title block |
| Contractor Pro | \$69/mo | \$13.80 / plan (5/mo) | General contractors & trade installers | Up to 20 address lookups/mo, up to 5 site plan exports/mo, company name on title block, full setback/ROW/structure layers |
| Builder Plus | \$299/mo | \$29.90 / plan (10/mo) | Custom, infill & modular builders | Up to 30 address lookups/mo, up to 10 site plan exports/mo, full company branding, Letter/A3/A4/A1 sheets (landscape & portrait) |
| Home Dealer / Retailer | \$499/mo | \$24.95 / plan (20/mo) | Manufactured, modular & mobile dealerships | Up to 50 address lookups/mo for sales-desk lot checks, up to 20 site plan exports/mo, dealership branding, multi-sheet sizes, fast revised plot plans |
| Done-For-You | From SitePlans.us | Per-project flat rate | Complex parcels or overflow drafting | Human-reviewed, non-certified permit-style site plan |
For Enterprise deals contact sales@siteplans.ai
High-Intent County Placement Guides Worth Checking First
Check county-specific placement rules across proven dealer markets before scheduling your next haul:
- Yakima County, WA — Road centerline offsets, Minimum Site Plan Requirements, and inter-structure review holds.
- Grant County, WA — 11" × 17" sheet cap, standard scales (
1"=20'to1"=50'), and L&I FAS coordination. - La Paz County, AZ — Explicit 10-item placement site plan list, wash distances, and land-split lockouts.
- Coconino County, AZ — Wastewater NOI prerequisite and portal submittal path (
04. Manufactured and Factory-Built Site Plan Review). - Yavapai County, AZ — County land-use permit sequencing prior to ADOH installation filing.
- San Joaquin County, CA — Scaled portal site plans detailing wells, septic leach fields, easements, and offsets.
Where to Verify State & County Rules After Your Site Plan Is Exported
Once your scaled placement drawing is ready, verify federal HUD-code installation framing and submit through your local county building/planning portal:
- HUD-Code National Program Overview: U.S. Department of Housing and Urban Development — Manufactured Housing Standards ( hud.gov Manufactured Housing ).
- Local Authority Routing: Confirm whether the parcel sits inside unincorporated county jurisdiction or incorporated city limits before uploading to the county or city permitting counter listed on the respective county guide above.
Frequently Asked Questions
1. What is the difference between a manufactured home placement site plan and an installation plan?
A placement site plan proves horizontal zoning compliance to the county or city (lot lines, setbacks, road centerlines, wells, septic, driveways, and existing structures). A manufactured home installation site plan coordinates physical setup details—foundation/pier systems, utility tie-ins, skirting, landings, and state installation permits.
2. Do dealers have to show existing sheds, shops, or second dwellings on a placement drawing?
Yes. Counties like Yakima County, WA and San Joaquin County, CA require every existing and proposed structure labeled and dimensioned. Leaving off a detached shop or second home routinely triggers plan-check holds.
3. What scales work best for county manufactured home placement submittals?
Common county-accepted scales include 1/4" = 10', 1" = 20', 1" = 30', 1" = 40', and 1" = 50' on 8½" × 11" or 11" × 17" sheets, depending on acreage size and county rules such as Grant County, WA.
4. Why do rural counties ask for distances to road centerlines instead of just the front lot edge?
Rural county roads vary in dedicated right-of-way width. Measuring offsets from the road centerline protects future county widening, drainage ditches, and utility corridors.
5. Should septic tanks, leach lines, and 100% reserve areas appear on placement plans?
Yes—always on unsewered parcels. Counties such as La Paz County, AZ, Coconino County, AZ, and San Joaquin County, CA block site plan issuance unless septic tanks, leach fields, and reserve zones maintain compliant setbacks.
6. How does checking a lot at the sales desk protect dealership margins?
Pulling the parcel before signing a buyer's land-home contract prevents committing factory deposits or haul trucks to parcels squeezed by utility easements, flood zones, unrecorded land splits, or tight setback geometry.
7. Can our coordinator revise a placement site plan if the buyer switches to a larger double-wide?
Yes. Open the saved parcel project, resize or rotate the unit footprint, adjust dimension callouts, and export an updated PDF within your existing monthly allowance.
8. What if a county demands a licensed land survey instead of an applicant-drawn site plan?
Certain strict municipalities, disputed lot corners, or floodplain zones require a PLS-stamped boundary survey. When mandated, hire a local licensed surveyor for legal monumentation while still using our tool for fast initial feasibility.
9. What happens if our client's county parcel doesn't load automatically in /#checker?
Submit the address lookup inside /#checker to trigger rapid county layer activation—our team prioritizes B2B parcel requests quickly, or you can draft from deed measurements or order a fast preliminary layout from SitePlans.us.
10. Do decks, porches, and propane tanks belong on the placement site plan?
Yes. Covered porches, steps, landings, carports, and LP tanks affect lot coverage, setback measurements, and fire separation across counties like Solano County, CA and Mohave County, AZ.
11. Which tier should a single-location manufactured home dealer pick first?
Home Dealer / Retailer (\$499/mo) provides 50 monthly address lookups for sales-desk lot checks and 20 exported site plans per month (\$24.95/plan) with dealership branding—ideal for active lots pulling permits every week.
12. What if our dealership needs custom volume beyond 20 exports a month?
Reach out directly to sales@siteplans.ai for multi-rooftop Enterprise plans built for regional retail groups and factory-direct teams.
Test Your Buyer's Parcel Before Ordering the Unit
Verify setbacks, road centerline clearances, and utility buffers in minutes from the job address.
Need our drafting team to prepare a complex rural placement site plan today?