Mobile Home Retailers: Don't Let a $0 Drawing Stall a $90,000 Delivery

Selling a mobile home to a buyer with private land is supposed to be the high-margin side of the business. Instead, deals sit in permitting limbo while your sales coordinator chases septic paperwork, waits on an outside drafter, or redraws a plot plan because one county wanted entry steps dimensioned and the next wanted desert washes and leach lines mapped.

When your sales desk can pull the buyer's parcel from an address, test whether the unit actually clears setbacks and easements before the deposit is signed, and export the placement plot plan in-house, you stop handing your delivery schedule to an outside drafting queue.

Mobile home dealer reviewing a scaled placement plot plan on a desktop monitor showing a single-wide and double-wide footprint, setback lines, entry steps, driveway, and septic leach field on a rural lot
Check whether the mobile home fits the buyer's parcel at the sales desk, then build the county placement plot plan from the exact same file.

Jump To The Permit Details That Matter

Every mobile home sitting on your lot with a "Sold" sign on the window is still costing you floorplan interest or tied-up cash until the set crew finishes and the county signs off. And the single biggest bottleneck between a signed purchase agreement and delivery day isn't the haul—it's the county placement permit package. One county won't touch your site plan until a wastewater permit is already issued. Another kicks the application back because the drawing shows the home's box footprint but leaves off the front steps and back landing. When you rely on an outside drafter or hand-sketched guesswork, every county correction pushes your delivery truck back another week. Using our browser-based site plan creator, your sales or permitting desk can pull real county parcel lines from the property address, drop in the exact single-wide or double-wide footprint, verify setbacks before the buyer signs, and turn that same file into a clean, scaled plot plan ready for permit intake.

Mobile Home Retailers: Don't Let a $0 Drawing Stall a $90,000 Delivery

Start Creating My Site Plan in Under 10 Minutes → Get a Done-For-You Plan →


Home › Projects › Mobile Home Retailers


The Hidden Bottleneck in Every Land-Home Deal

Selling a mobile home into a park is simple. Selling a new or pre-owned mobile home onto a customer's private parcel is where your delivery calendar goes sideways.

The buyer already picked their floor plan. Financing is lined up, or cash is in escrow. Your transport driver is ready to hook up. Yet the unit sits on your sales lot because the county placement permit hasn't cleared—and the permit hasn't cleared because the plot plan either isn't drawn yet, got rejected at intake for a missing detail, or is stuck behind a septic approval nobody checked at the sales desk.

When you sell across county lines, you aren't dealing with one universal rulebook:

  • One county calls the drawing a Plot Plan and demands it scaled on an 8½ × 11" sheet with every single entrance step, landing, and deck sized and drawn.
  • The next county calls it a Site Plan and won't even issue that permit until an approved wastewater Notice of Intent (NOI) permit is already in hand.
  • Another county requires every dry wash, ditch, creek, well, and septic leach line dimensioned across the property.
  • And if your set crew shifts the home a few feet on delivery day to dodge a boulder or a tree, you can trigger a Revised Plot Plan or freeze the final permit close-out until state and county inspectors reconcile the change.

Our browser-based site plan creator puts the parcel check and the placement drawing directly in your dealership's hands. Your first plan is free—no card required—so you can test a live customer parcel today.


What Four Arizona Counties Actually Demand on a Placement Plan

Nothing illustrates why generic templates fail better than looking at four neighboring Arizona counties side by side. Even when you are delivering the exact same home, the drawing and the permit sequence change completely at the county line.

Requirement AreaMohave CountyYavapai CountyLa Paz CountyCoconino County (Effective Jan 23, 2025)
Official Document NamePlot PlanPlot PlanSite PlanSite Plan
Scale & Sheet FormatScaled 8½ × 11" plot plan (the manufactured home checklist requires a scaled plan, overriding the county's general unscaled plot plan note)Drawn to scale per county instructions for drawing a plot/site planSite plan with specific required content list (published checklist does not state a specific scale ratio)Scaled site plan uploaded digitally (published guide does not state a specific scale ratio)
Structures & Entrances to ShowProposed home, all existing and proposed accessory structures with exact sizes/types, plus locations and sizes of all steps, landings, and decks at every entrance/exit (must meet IRC)Proposed unit plus all original accessory structures, accompanied by a Floor Plan with all rooms labeled by useLocations and dimensions of all existing and proposed structures, including distances between structuresScaled site plan, floor plan, and a copy of the parcel's Design Criteria Report
Septic, Wells & Water FeaturesSeptic location with leach line distances to structures; Septic Permit Application Form or proof of existing wastewater system submitted with applicationCompleted Septic Permit Form or proof of existing wastewater system submitted with applicationProof of approved septic system (per Zoning Reg. Section 101.03); dimension lines to wells, septic systems, and leach fields; all washes, ditches, creeks, and drainages with distancesApproved wastewater system (NOI permit) must be issued PRIOR to issuance of the MFH Site Plan permit
Utilities, Access & EasementsUtility locations; all easements with size and type; all adjacent streets with complete addressSpecify new or upgraded electric pedestal (county inspects; $150 inspection fee applies with or without electric)All easements, roads, rights-of-way, and driveways; all existing and proposed utility locations with dimension linesReviewed across Planning & Zoning, Engineering, and Environmental Quality (EQ)
State (ADOH) vs. County SequenceCounty placement permit and state installation requirements run on their respective tracks; installation manual must be on siteProof of State Permit must be submitted to Yavapai County prior to the county's first inspectionInstallation must be performed by an ADOH-licensed installer; floodplain permit required in Special Flood Hazard AreasCounty site plan approval is required BEFORE continuing through the ADOH process; county performs only site plan review and setback inspection, while ADOH performs all other inspections
Post-Placement & Revision TriggersApproved plot plan and installation manual must be on site for inspectionModifying the installation permit with the State MAY require a Revised Plot Plan or additional permit from Yavapai CountyIncomplete applications may delay the proposed projectSetter or owner must forward the ADOH MFH Inspection Report to Coconino County; county permit cannot close until all divisions enter final approval

Four Operational Takeaways for Your Dealership

  1. Never assume Mohave's "not to scale" note applies to your homes. While Mohave County's general plot plan webpage mentions showing information even if not to scale, Mohave's specific Residential Manufactured Home Permit Checklist explicitly requires a scaled 8½ × 11" Plot Plan. Always build to the stricter mobile/manufactured home checklist.
  2. Don't draw a bare rectangle in Mohave County. A footprint without entry steps, landings, or decks at each door fails Mohave's checklist before the reviewer even checks your setbacks.
  3. In Coconino County, the January 23, 2025 rule change flipped the workflow. Coconino County now performs only the site plan review and setback inspection—ADOH handles the rest—and you cannot even get the county MFH Site Plan permit issued until the wastewater NOI permit is approved.
  4. What about professional seals? None of the official county checklists reviewed above state that a licensed surveyor or engineer must seal the residential placement site plan itself. However, absence of a stated requirement on a checklist is not a blanket waiver—always confirm directly with the local building or zoning counter before relying on a dealer-prepared drawing, especially on floodplain, hillside, or variance lots.

Why Mobile Home Deals Stall Between Contract and Set Day

Official county checklists don't publish rejection percentages or average delay days, so we won't make up numbers. You already know what happens on your lot when a permit file gets kicked back. Looking at the county rules above, three operational bottlenecks cause almost every avoidable hold-up:

1. Quoting a Delivery Window Before Checking the Lot and Septic

When a buyer walks in with a parcel number and a down payment, the temptation is to write up the deal and figure out the land later. If that parcel is in Coconino County without an approved wastewater NOI, or in La Paz County with an unmapped desert wash cutting across the buildable pad, your permit clock hasn't even started. Running a 10-minute parcel check at the sales desk surfaces those blockers while you can still adjust the home size, orientation, or delivery terms.

2. Waiting on an Outside Drafter's Queue

If your dealership pays a local drafter for every placement plot plan, you wait on their schedule twice: once for the initial drawing, and a second time if the county reviewer asks for a missing leach-field distance, an electric pedestal note, or a step dimension. And in jurisdictions like Coconino—where you need county site plan approval before you can proceed through ADOH—every day in a drafter's queue holds up the state track too.

3. The Set Crew Moves the Home, and the Permit Can't Close

It happens constantly on rural lots: the transport driver arrives, spots a soft spot, a rock outcrop, or a low branch, and sets the home five feet over or rotates it slightly. In Yavapai County, modifying the state installation permit can trigger a Revised Plot Plan requirement. In Coconino County, the county performs a post-placement setback inspection and holds the permit open until the ADOH inspection report comes back and every division signs off. When your plot plan lives in an editable project inside our platform, updating the drawing to match a field adjustment takes minutes instead of starting from scratch.


New HUD Units, Used Trade-Ins, and Pre-HUD Mobile Homes

Mobile home retailers often handle a wider mix of inventory than new-only dealerships—including single-wide and double-wide trade-ins, bank repos, park pull-outs moving to private acreage, and modular or factory-built buildings (FBB).

The site plan workflow in our tool is identical regardless of whether the home is brand-new from the factory or a pre-owned unit relocating onto rural land, with two extra checks your sales desk should run up front:

  • Age and rehabilitation rules: Many counties and cities restrict pre-HUD mobile homes (built prior to June 15, 1976) or require specific state rehabilitation certificates before issuing a placement permit on an individual parcel. Always verify the unit's data plate and the county's age ordinance before drawing the site plan.
  • Original vs. added accessory structures: If a buyer is placing a unit alongside an existing shed, detached garage, carport, patio, or fence, Yavapai, Mohave, and La Paz all require existing structures and inter-structure distances shown on the plan.

Step-by-Step: From Sales-Desk Lot Check to Permit-Ready Plot Plan

You don't need CAD training to produce a clean, scaled placement drawing. Roughly 80% of the base map is generated automatically from county parcel data.

Phase 1: The 10-Minute Pre-Contract Lot Check (Sales Desk)

  1. Enter the buyer's parcel address. In covered counties, the platform pulls the property boundary with real bearings and distances, existing building footprints, and aerial context.
  2. Select and verify the parcel. Confirm the parcel number and boundary lines match the buyer's deed or county assessor map.
  3. Generate zoning setbacks. Enter the front, rear, and side yard setback distances for that zoning district to see the legal buildable envelope immediately.
  4. Place the mobile home footprint. Draw or drop in the exact dimensions of the single-wide, double-wide, or multi-section home and rotate it to test how it fits the pad.

Right there at the desk, you and the customer can see whether a 28 × 60 double-wide clears the setbacks and leaves room for the septic system—before anyone signs a contract that can't be permitted.

Phase 2: Finishing the County Placement Plan (Permit Coordinator)

Once the deal is signed, your permit coordinator opens the exact same saved project and finishes the county-specific details in minutes:

  1. Draw entrances, steps, landings, and decks. Use the structure and deck placement tools to draw and size every entrance landing and stair required by checklists like Mohave County's.
  2. Add access, utilities, and septic distances. Draw the driveway, mark utility runs and the electric pedestal location, outline the septic tank and leach field, and trace any easements or washes crossing the lot.
  3. Create dimension lines. Snap clear distance callouts from all four sides of the mobile home to the property lines, between structures, and from the leach field to the home.
  4. Clean up property line labels and generate the title sheet. Format the sheet with the true north arrow, scale bar, parcel number, owner name, and street address, then export a crisp PDF ready to print on 8½ × 11" or upload to the county portal.

Pre-Quote Checklist for Mobile Home Sales Teams

Keep this table at the sales desk. Answering these eight questions before you quote a delivery date protects your margin and keeps your set crew moving:

Pre-Quote QuestionWhat It Protects You From
1. Is the parcel inside city limits or unincorporated county?Submitting a county plot plan for a lot that actually falls under a municipal building department (like Bullhead City inside Mohave County).
2. What is the exact septic / wastewater status?Stalling out in Coconino County (where the wastewater NOI must be issued before the site plan permit) or getting rejected at intake in Mohave, Yavapai, or La Paz for missing septic proof.
3. Does a wash, creek, ditch, or floodplain cross the lot?Missing La Paz County's mandatory wash-distance callouts or discovering mid-permit that the buyer needs a Floodplain Permit and Elevation Certificate.
4. What steps, decks, awnings, or carports are included in the sale?Having Mohave or Yavapai reject the plot plan because entry steps, landings, or original accessory structures were left off the drawing.
5. Does the parcel need a new or upgraded electric pedestal?Surprising the buyer with Yavapai County's electric pedestal inspection requirement and $150 inspection fee.
6. Do we need a labeled Floor Plan or Design Criteria Report?Uploading only a site plan in Yavapai (which requires a room-labeled floor plan) or Coconino (which requires both a floor plan and the parcel's Design Criteria Report).
7. Who is the ADOH-licensed installer on the job?Delays in La Paz, Yavapai, or Coconino where state permit proof, licensed installer verification, and ADOH inspection reports tie directly into county inspections.
8. Can the transport truck physically make the turn into the pad?Laying out a home on paper that clears setbacks but can't be backed in past a narrow gate, ditch, or overhead power line.

How Dealerships Compare Their Options

Hand-Drawn Sketch by SalespersonOutside Local DrafterSitePlans.ai (In-House)Done-For-You via SitePlans.us
Turnaround Time1–2 hours (often rejected if unscaled or messy)Days to weeks depending on drafter's queue10–15 minutes once parcel & septic info are readyFast turnaround with human review
Parcel Bearings & DistancesManually copied from assessor mapDrawn from deed or GISAuto-loaded from county parcel data in covered areasIncluded
Scaled OutputHard to keep to true scale by handYesYes — true-to-scale PDF exportYes
Cost Control"Free" until an intake rejection delays deliveryPer-plan drafting fee + revision chargesFirst plan free; flat monthly tiers for repeat volumePer-project flat pricing
Field Revision SpeedRedraw the whole sheet by handWait in the drafter's queue againOpen saved project, move footprint, re-export in minutesManaged by drafting team

Permitting high-volume subdivisions or stick-built spec homes alongside your dealership lots? See how production home builders and general contractors use our repeat-volume plans.


Where Automatic Parcel Data Is Live Today

Because mobile homes are frequently placed on rural acreage, checking county GIS coverage comes first. Automatic parcel boundary loading is confirmed and live in these states and counties:

StateConfirmed Covered Counties
ArizonaMohave County
TexasMontgomery, Travis, Denton, Fort Bend, Dallas
FloridaMiami-Dade, Broward, Pinellas, Pasco, Lee, Manatee, Palm Beach
North CarolinaWake, Durham, Guilford, Buncombe, Forsyth
GeorgiaFulton, DeKalb, Gwinnett, Cobb, Henry, Paulding, Douglas
South CarolinaCharleston
TennesseeDavidson County, Hamilton

Selling into Yavapai, La Paz, Coconino, or another rural county not listed above?

While automated parcel pull is currently confirmed in Arizona for Mohave County, our coverage expands based on dealer demand. For parcels in counties where automatic GIS pull isn't live yet—or when your team is slammed and wants someone else to draw a complex irregular lot—you can order a human-reviewed, non-certified placement plan through SitePlans.us. Always verify local county submittal rules before submitting in any jurisdiction.


Pricing Built for Single Placements or Multi-Lot Dealerships

Your first plan is free — no card required. Test the workflow on a real customer parcel right from your sales desk.

PlanPriceBest ForWhat You Get
Free / Basic$0Testing a lot or permitting a single placementOne project, 5 PDF exports, letter landscape title sheet, editable title block, property lines
Contractor Pro$69/moIndependent mobile home dealers & setup crewsRepeat monthly projects, branded title blocks, advanced layer management
Builder Plan$299/moMulti-lot dealerships & land-home developersHigh-volume projects, multiple sheet sizes, company branding, advanced layers
Done-For-YouFrom SitePlans.usComplex rural parcels, unmapped counties, or overflowHuman-reviewed, non-certified permit-style site plan

For Enterprise deals contact sales@siteplans.ai


What This Doesn't Replace

Being upfront about what a site plan tool can and cannot do saves your dealership from costly surprises at the permit counter.

SitePlans.ai helps create preliminary, conceptual, permit-style site plans and plot plans where local rules allow dealer-, homeowner-, or contractor-prepared drawings. It is not:

  • A licensed land boundary survey
  • A PE, PLS, or architect-sealed engineering drawing
  • An engineered foundation, tie-down, or anchoring plan
  • A septic system design, percolation test, or wastewater NOI permit
  • A FEMA Floodplain Permit or Elevation Certificate
  • A substitute for your state installation permit (such as ADOH) or a guarantee of permit approval

Where a county or state agency requires a licensed surveyor, an engineered foundation design, a certified floodplain elevation certificate, or a professional seal, that requirement must still be followed.


Frequently Asked Questions

1. Can a mobile home retailer draw its own placement plot plan?

In many counties, yes—provided the drawing is scaled, legible, and includes every item on the county's checklist. In our review of published checklists for Mohave, Yavapai, La Paz, and Coconino counties, none of the documents state a requirement that the placement site plan itself be sealed by a licensed surveyor or engineer. However, rules vary by jurisdiction and lot condition (such as floodplains or tight boundary disputes), so always confirm directly with the county permitting office before submitting a dealer-prepared plan.

2. Why does Mohave County reject mobile home plot plans that only show the home's box footprint?

Because Mohave County's Residential Manufactured Home Permit Checklist explicitly requires you to "Show locations and sizes of all steps, landings and/or decks at each entrance/exit of the Manufactured Home (must meet IRC requirements)." Leaving off the entry stairs or landings makes the submittal incomplete.

3. Does Mohave County accept unscaled plot plans for mobile homes?

Do not count on it. While Mohave County's general plot plan information page says details must be shown "even if it is not to scale," the specific Residential Manufactured Home Permit Checklist requires one scaled 8½ × 11" Plot Plan. Always prepare a scaled drawing for mobile and manufactured home placements.

4. What changed in Coconino County on January 23, 2025?

Effective January 23, 2025, Coconino County updated its unincorporated manufactured/mobile home process so the county performs only the site plan review and setback inspection, while the Arizona Department of Housing (ADOH) performs all other installation inspections. In addition, an approved wastewater system (NOI permit) must be issued before Coconino County will issue the MFH Site Plan permit, and county site plan approval is required before continuing through the ADOH process.

5. In what order do county and state (ADOH) permits happen in Yavapai County?

In Yavapai County, you submit your scaled plot plan, room-labeled floor plan, and septic form/proof to the county, and you must submit proof of the State Permit prior to Yavapai County's first inspection. Also note that Yavapai County inspects new or upgraded electric pedestals and charges a $150 inspection fee with or without electric.

6. What happens if our set crew places the mobile home slightly differently than shown on the approved plan?

Inspectors measure the placed home against the approved site plan. In Yavapai County, modifying the installation permit with the State may require a Revised Plot Plan or an additional county permit. In Coconino County, the county conducts a setback inspection and cannot close the county permit until the final ADOH inspection report is forwarded and all county divisions enter final approval. If a field shift is unavoidable, update your project in SitePlans.ai and check with the county before setting the unit.

7. What extra site features does La Paz County require on a mobile home site plan?

Beyond property lines, setbacks, structure dimensions, and utilities, La Paz County's Placement Permit Application Checklist specifically requires locations and distances of all washes, ditches, creeks, and drainages (if applicable), plus locations and dimension lines to wells, septic systems, and leach fields, accompanied by proof of an approved septic system per Zoning Regulation Section 101.03.

8. Can we use SitePlans.ai when placing a used or pre-owned mobile home?

Yes. You can enter any custom width and length for a single-wide, double-wide, or accessory structure. Keep in mind that local zoning codes often regulate unit manufacture dates (especially pre-1976 units) and require state rehabilitation compliance, which you must verify separately from the site plan.

9. What is a Design Criteria Report, and which county asks for it?

Coconino County requires applicants to upload a copy of their parcel's Design Criteria Report alongside the scaled site plan and floor plan when applying for a manufactured/mobile home site plan permit.

10. Do we need to include a floor plan with the site plan?

In Yavapai County and Coconino County, yes. Yavapai County requires a floor plan with all rooms labeled according to use, and Coconino County requires uploading a floor plan alongside the scaled site plan and Design Criteria Report.

11. How do we handle irregular rural parcels where property line labels overlap?

Rural acreage often has angled boundaries or short curve segments that clutter a small sheet. You can use the clean property line labels feature and save and reload your project anytime to keep dimensions readable on an 8½ × 11" export.

12. Does SitePlans.ai guarantee our placement permit will be approved?

No. Final acceptance always depends on the local building and zoning department, wastewater approval, floodplain rules, and state housing agency compliance. Our platform gives your team a fast, accurate way to build and revise the drawing to match the local checklist.


Run Your Next Customer Parcel Before They Sign

Stop finding out about setback pinch points and missing septic clearances after the home is already under contract. Pull up a live lead's address right now, drop the home footprint onto the lot, and see how fast your sales desk can build a placement plot plan in-house.

Create My Site Plan Now →