Mobile Home Dealers: Vet the Parcel, the Septic, and the County Checklist Before You Dispatch a Truck

Every mobile home dealer has lived through the same headache: a buyer brings in a rural parcel number, picks a unit off your lot, and wants delivery next week. Then the county counter rejects the submittal because the lot is mid-split, the existing septic isn't recorded, the Park Model is six years old, or the plot plan is missing wash distances and entry landings.

SitePlans.ai gives your sales and permitting desk a faster way to work. Pull the parcel from its address in covered counties, lay out the home and accessory structures to scale, verify setbacks in ten minutes, and export the placement plot plan without waiting on an outside drafter.

Mobile home dealership coordinator laying out a scaled rural placement plot plan showing a mobile home footprint, porch, septic tank and leach trench, reserve area, well, and desert wash distances
Verify unit eligibility, septic clearances, and zoning setbacks before you schedule your transport truck and ADOH-licensed installer.

Jump To The Permit Details That Matter

When you run a mobile home dealership, your profit margin gets eaten alive in the weeks between a signed purchase contract and final set inspection. And most of those delays happen because no two counties ask for the same placement package. In La Paz County, the reviewer checks a strict 10-item site plan list—right down to washes, creeks, wells, and septic reserve areas—and won't even accept the application if the buyer's parcel is in the middle of a land split. In Yavapai County, Section 552 bans Pre-HUD mobile homes on individual lots outright, Section 565 caps Park Models at five years old, and your county land-use permit has to issue before you can apply to the State. Waiting days for a freelance drafter to draw and redraw those lot plans keeps your inventory locked up. Our browser-based site plan creator lets your own staff check the lot at the sales desk and generate a clean, scaled plot plan in minutes.

Mobile Home Dealers: Vet the Parcel, the Septic, and the County Checklist Before You Dispatch a Truck

Create My Site Plan in Under 10 Minutes → Get a Done-For-You Plan →


Home › Projects › Mobile Home Dealers


Why Dealerships Get Burned Between the Deposit and the Placement Permit

If your dealership sells new HUD-code homes, used single-wides and double-wides, trade-ins, or Park Models for placement on private land, you face two sets of county rules on every deal: whether the unit itself is legal on that parcel, and what the county demands on the placement site plan.

Miss either one at the sales desk, and you end up holding a unit you can't deliver:

  • Unit age & type traps: A buyer wants to put an older trade-in or a 7-year-old Park Model on their acreage in Yavapai County. Under Section 552 of the Yavapai County Planning and Zoning Ordinance, installing a Mobile (Pre-HUD) home on an individual lot is prohibited outright—and under Section 565, Park Models used as dwelling units must not be more than five years old at the time of installation. In La Paz County, newly placed manufactured homes or Park Models must be manufactured on 06/15/1976 or newer to be permitted.
  • Parcel & septic blockers: In La Paz County, the counter will not accept a placement application if the buyer's parcel is currently in the Land Division or Land Combination process, and any unrecorded septic system must be verified on the property by the county prior to permit issuance. In Coconino County, an approved wastewater system (NOI permit) must be issued before the county will issue the site plan permit.
  • Checklist omissions on the drawing: Draw a plot plan in Mohave County without sizing the steps, landings, and decks at every entrance, or submit a site plan in La Paz County without mapping desert washes, ditches, wells, and the septic leach trench + reserve area, and your file stalls at intake.

With SitePlans.ai, your dealership can pull the parcel map at the sales desk, check the layout in ten minutes, and build the county-specific plot plan in-house—without paying or waiting on a third-party drafter.


County-by-County Breakdown for Mobile, Manufactured & Park Model Dealers

Here is what the official published documents require across four Arizona counties where dealers frequently place units on private parcels:

Rule CategoryYavapai CountyCoconino County (Unincorporated — Effective Jan 23, 2025)La Paz CountyMohave County
Permit Type & Agency SplitCounty issues the land-use permit first (copy of approved, issued Yavapai County permit must go to the State with the ADOH application). ADOH permits & inspects the unit and contract accessories.Portal category "Building" → "04. Manufactured and Factory-Built Site Plan Review." County only performs (1) site plan review and (2) setback inspection; ADOH completes all other inspections. County site plan approval is required before continuing through ADOH.Placement Permit specific to Manufactured Homes, RVs, and Containers. While an owner may be issued the permit, installation must be done by an ADOH-licensed installer.Residential Plot Plan (8½ × 11") vs. Commercial Site Plan (sealed, up to 36 × 36").
Pre-HUD (Pre-06/15/1976) & Park Model RulesSection 552 prohibits installing a Mobile (Pre-HUD) home on an individual lot. Park Models (Section 565) are allowed as dwelling units but must be ≤ 5 years old at installation.Pre-HUD units are subject to rehabilitation per ordinance (MHP Zone).Newly placed manufactured homes or Park Models must be made on 06/15/1976 or newer to be permitted.Verify specific zoning district overlays via Mohave County Development Services.
What the Drawing Must ShowPlot Plan to scale (per county instructions) showing all original accessory structures, plus a Floor Plan with all rooms labeled by use.Upload a scaled site plan, floor plan, and a copy of the parcel's Design Criteria Report.Explicit 10-item Site Plan list (see full 10-item table below), including septic tank, leach trench, and reserve area.Scaled 8½ × 11" Plot Plan showing home, accessory structures, utilities, leach line distances, and locations/sizes of all steps, landings, and decks at each entrance/exit (must meet IRC).
Septic / Wastewater RulesCompleted Septic Permit Form or proof of existing wastewater system required in the submittal package.Approved wastewater system (NOI permit) must be issued PRIOR to issuance of the MFH Site Plan permit.Proof of approved septic system required per Zoning Reg. Section 101.03. Unrecorded septic systems must be verified by La Paz County prior to permit issuance (or owner provides info).Septic Permit Application Form or proof of existing wastewater system required with submittal.
Foundations, Porches, Anchors & FeesSpecify new or upgraded electric pedestal (inspected by Yavapai County; $150.00 fee, with or without electric). Gas, water, and sewer/septic yard lines are inspected by the State.Encroachment permit required for a driveway; conditional permits for floodplain or propane tank.Storm anchors (min. 4 per side) and skirting required. Masonry/wood foundations, porches, awnings, and ramadas require a separate building permit. (Note: La Paz published notice that the state-set Placement Permit fee increased from $650 to $700 beginning Aug 5, 2025—confirm current fee with county.)Confirm current manufactured home permit and floodplain fees with Mohave County Development Services.
Post-Approval & Close-Out RulesProof of State Permit must be submitted to Yavapai County prior to the county's first inspection. Modifying the State permit may require a Revised Plot Plan.After placement, call County for setback inspection; after ADOH finishes, setter/owner must forward the MFH Inspection Report to Coconino County so all divisions can enter final approval.Floodplain permit (and possible elevation certificate) required in Special Flood Hazard Areas; no applications accepted if parcel is in Land Division / Combination process.Approved plot plan and installation manual must be on site at inspection.

Inside La Paz County's Explicit 10-Item Site Plan Checklist

While some counties refer to general drawing instructions, La Paz County publishes the most explicit itemized checklist of the group. Every placement permit site plan in La Paz County must include these ten elements—and our browser-based tool is built to help your coordinator check off every single one:

La Paz Checklist ItemHow Your Dealership Handles It in SitePlans.ai
1. North ArrowAutomatically included on your formatted sheet output.
2. Parcel # and AddressEnter the address and populate the APN and street address directly in the editable title block.
3. Street NamesLabel all adjacent roads and generate right-of-way lines.
4. Dimensional Lot LinesAuto-loaded with real bearings and distances in covered counties, or drawn/traced to exact deed dimensions.
5. Setback Lines with Dimensions to Property LinesOne-click setback generation plus snapped dimension lines to all four boundaries.
6. Locations & Dimensions of All Existing and Proposed Structures (with inter-structure distances)Place the mobile home alongside any existing shed, garage, patio, or fence and dimension the clearance between each building.
7. Locations & Distances of All Washes, Ditches, Creeks, and DrainagesTrace desert washes, drainage swales, and ditches across the parcel and snap distance callouts to the home pad.
8. All Easements, Roads, Rights-of-Way, and DrivewaysDraw the driveway and mark recorded access and utility easements across the lot.
9. Location & Dimension Lines to Wells, Septic Systems, and Leach FieldsDraw the well, septic tank, leach trench, and reserve area with clear separation dimensions to structures and lot lines.
10. Locations & Dimension Lines of All Existing and Proposed UtilitiesMap electric, water, gas/propane, and sewer connections with dimension callouts.

What the Published Checklists Say About Scale and Professional Seals

Dealers often get conflicting advice about whether they need to hire a surveyor just to submit a placement plot plan. Here is what the official county documents actually say:

  • On Scale: Mohave County's Residential Manufactured Home Permit Checklist requires a scaled 8½ × 11" Plot Plan (do not rely on Mohave's general plot plan page that mentions unscaled drawings—the manufactured home checklist controls). Yavapai County requires a "Plot Plan to scale per the Instructions for drawing a Plot/Site Plan," and Coconino County requires a "scaled site plan." Neither the Yavapai, Coconino, nor La Paz summaries specify a single mandatory scale ratio (such as 1" = 20'), so your coordinator can select a clean engineering scale in SitePlans.ai that fits the entire parcel legibly on the page.
  • On Surveyor / Engineer Seals: None of the reviewed residential placement checklists for Mohave, Yavapai, Coconino, or La Paz state that a licensed surveyor or engineer must seal the residential placement site plan itself. Because we never guess at unstated rules, always confirm directly with the county permitting counter whether your specific parcel (for example, a lot in a Special Flood Hazard Area or hillside overlay) requires a sealed survey or elevation certificate.

Your Dealership's 4-Step In-House Workflow

  1. Vet the Unit & Parcel at the Sales Desk (5 Minutes): Before taking a deposit on a used mobile home or Park Model, check the county's age rule (Yavapai's Section 552 Pre-HUD ban and Section 565 5-year Park Model limit; La Paz's 06/15/1976 cutoff; Coconino's MHP Zone rehabilitation rule) and confirm the parcel isn't tied up in a La Paz Land Division/Combination or missing a Coconino wastewater NOI permit.
  2. Pull the Lot & Test the Footprint (5 Minutes): Type the address into SitePlans.ai. In covered counties, the parcel boundary loads automatically. Place the mobile home and generate setbacks right in front of the customer to prove the unit fits.
  3. Detail the Placement Plan In-House (10 Minutes): Once under contract, your permit coordinator opens the saved project, adds entry decks and steps (for Mohave), labels original accessory structures (for Yavapai), maps washes and the septic tank/leach trench/reserve area (for La Paz), and cleans up property line labels.
  4. Export the Scaled PDF & Keep It Synced Through Inspection: Upload or print your scaled plan for the county. If a field adjustment during installation modifies the state permit (which can trigger a Revised Plot Plan in Yavapai County or affect Coconino County's setback inspection), reload the project, shift the footprint, and export a revised plan in minutes.

Also placing multi-section modular / Factory-Built Buildings or stick-built spec homes? See our dedicated guides for modular home dealers, modular home retailers, and home builders.


Where Automatic Parcel Data Is Live

Entering an address automatically loads parcel boundaries with bearings, distances, and existing building footprints in these confirmed states and counties:

StateConfirmed Covered Counties
ArizonaMohave County
TexasMontgomery, Travis, Denton, Fort Bend, Dallas
FloridaMiami-Dade, Broward, Pinellas, Pasco, Lee, Manatee, Palm Beach
North CarolinaWake, Durham, Guilford, Buncombe, Forsyth
GeorgiaFulton, DeKalb, Gwinnett, Cobb, Henry, Paulding, Douglas
South CarolinaCharleston
TennesseeDavidson County, Hamilton

Delivering into Yavapai, Coconino, or La Paz County?

In Arizona, automatic parcel data integration is currently confirmed for Mohave County (including Bullhead City), while coverage across additional Arizona counties is expanding. For placements in Yavapai County, Coconino County, La Paz County, or any county outside current automated GIS coverage—or whenever you want a human drafter to put together a complex rural site plan for your dealership—order a human-reviewed, non-certified plan through SitePlans.us.


Pricing for Mobile Home Dealers

Your first plan is free — no card required. Test a real customer lot right now.

PlanPriceBest ForWhat You Get
Free / Basic$0Checking your first customer parcelOne project, 5 PDF exports, letter landscape title sheet, editable title block, property lines
Contractor Pro$69/moIndependent mobile home dealers & set crewsRepeat monthly projects, branded title blocks, layer controls
Builder Plan$299/moHigh-volume multi-lot dealershipsMultiple sheet sizes, company branding, advanced layers
Done-For-YouFrom SitePlans.usUnmapped counties, irregular acreage, or overflowHuman-reviewed, non-certified permit-style site plan

For Enterprise deals contact sales@siteplans.ai


What This Doesn't Replace

SitePlans.ai helps create preliminary, conceptual, permit-style site plans and plot plans where local rules allow dealer-, homeowner-, or contractor-prepared drawings. It is not:

  • A licensed land boundary survey
  • A PE, PLS, or architect-sealed engineering drawing
  • An engineered foundation, stem-wall, or storm-anchor design
  • A room-labeled floor plan or parcel Design Criteria Report
  • A septic system verification, percolation test, or wastewater NOI permit
  • A FEMA Floodplain Permit or Elevation Certificate
  • A substitute for an ADOH-licensed installer, state installation permit, or separate county building permit for porches/foundations

Where a county or state agency requires a licensed surveyor, engineered plans, or a professional seal, that requirement must still be followed.


Frequently Asked Questions

1. Can we place a Pre-HUD (pre-June 15, 1976) mobile home on an individual lot in Yavapai or La Paz County?

No. Section 552 of the Yavapai County Planning and Zoning Ordinance prohibits the installation of a Mobile (Pre-HUD) home on an individual lot, and La Paz County requires newly placed manufactured homes or Park Models to be made on 06/15/1976 or newer to be permitted. In Coconino County, Pre-HUD units are subject to rehabilitation per county ordinance (MHP Zone). Always check the unit's manufacture date before drawing a site plan.

2. What are the age rules for placing a Park Model as a dwelling unit in Yavapai County?

Under Section 565 of the Yavapai County Planning and Zoning Ordinance, Park Models are allowed as dwelling units, but they must not be more than five years old at the time of installation.

3. Why won't La Paz County accept our placement permit application on a newly split parcel?

La Paz County's placement permit rules state that an application will not be accepted if the parcel is currently in the Land Division or Land Combination process. Wait until the split or combination is officially completed and recorded before submitting.

4. Do porches, awnings, ramadas, or wood/masonry foundations require a separate permit in La Paz County?

Yes. While La Paz County's Placement Permit covers the placement of Manufactured Homes, RVs, and Containers (and requires a minimum of four storm anchors per side plus skirting), masonry or wood foundations, porches, awnings, and ramadas require a separate building permit.

5. What if a buyer's La Paz County parcel has an existing septic system that isn't recorded?

Proof of an approved septic system is required per La Paz County Zoning Regulation Section 101.03, and your site plan must show the septic tank, leach trench, and reserve area. Non-recorded septic systems must be verified on the property by La Paz County prior to permit issuance; if the county cannot verify it, the property owner is responsible for providing the information.

6. How much is the placement permit or electric inspection fee in these counties?

Fees are set by each jurisdiction and change over time:

  • Yavapai County charges a $150.00 inspection fee for the electric pedestal inspection (with or without electric).
  • La Paz County's applications page noted a state-set Placement Permit fee increase from $650.00 to $700.00 beginning August 5, 2025 (an older county page referenced $450 in 2022). Because this fee is set by the State of Arizona and subject to change, confirm the current rate directly with La Paz County before quoting a buyer.

7. Can a homeowner pull a La Paz County placement permit and install the mobile home themselves?

No. While a property owner may be issued the placement permit in La Paz County, the installation must be done by an installer licensed by the Arizona Department of Housing (ADOH).

8. Which permit comes first in Yavapai and Coconino counties—the county permit or the ADOH state permit?

In both counties, county approval comes first. In Yavapai County, you must provide a copy of the approved, issued Yavapai County permit to the State as part of the State application, and later submit proof of the State Permit back to Yavapai County prior to the county's first inspection. In Coconino County, an approved wastewater NOI permit is required before the county site plan permit issues, and the approved county site plan is required to continue through the ADOH process.

9. What does Mohave County require on a residential mobile/manufactured home plot plan that other counties don't explicitly list?

Mohave County's Residential Manufactured Home Permit Checklist explicitly requires a scaled 8½ × 11" Plot Plan that shows the locations and sizes of all steps, landings, and/or decks at each entrance/exit of the home (meeting IRC requirements), along with septic leach line distances to structures.

10. How fast can our dealership generate or revise a plot plan in SitePlans.ai?

Once you have the parcel and septic details, most dealership coordinators can lay out the home, generate setbacks, add dimensions, and export a scaled PDF in 10 to 15 minutes. If a field change triggers a Revised Plot Plan, editing the saved project takes only a few minutes.


Check Your Next Buyer's Lot Before You Write Up the Deal

Run a live parcel address through our site plan creator right now, test the setbacks, and see how effortless in-house plot plans can be for your dealership.

Start Creating My Site Plan Now →

Placing a unit in an unmapped county or need a human drafter to build the plan for you?

Get a Done-For-You Plan from SitePlans.us →