Manufactured Home Installation Site Plans: Keep Pier Tracks, Utility Yards, and State-to-County Re-Checks Aligned

Once a buyer's lot clears initial placement review, the real schedule risk shifts to installation permitting and field close-out. Dealership setup coordinators routinely juggle two separate tracks at once: local county requirements covering piers/anchoring/skirting, utility yard lines, or permanent foundation conversions alongside state housing agencies managing HUD installation decals and structural inspections.

When an installer shifts an entry landing by three feet or a county splits pier-and-skirting submittals from real-property foundation plan checks, owning an editable installation site plan lets your office turn redlines around immediately without sidelining set crews.

manufactured home installation site plan — scaled permit site plan example
Once a buyer's lot clears initial placement review, the real schedule risk shifts to installation permitting and field close-out.

Jump To The Permit Details That Matter

A manufactured home installation site plan keeps your physical setup packet aligned across foundation engineering, utility hookups, contractor-installed decks/porches, and two-agency county-to-state inspections. Depending on the jurisdiction, rules split sharply at installation time: Sonoma County, CA requires 4 sets of site plans for non-permanent support systems versus full HCD/plan check on permanent foundations; San Luis Obispo County, CA applies a dedicated Manufactured Home Permanent Foundation site plan and construction checklist; Nassau County, FL enforces an MH Application Sufficiency Checklist covering site prep, piers, anchoring, and skirting; and Yavapai County, AZ inspects new or upgraded electric pedestals ($150) and requires a Revised Plot Plan if state installation edits alter the footprint. Keeping one master parcel project in-house ensures installation changes never trigger drafting stalls.

Manufactured Home Installation Site Plans: Keep Pier Tracks, Utility Yards, and State-to-County Re-Checks Aligned

Load a Job Address → Get a Done-For-You Plan →


Create the Installation Site Plan Your Crew Needs for This Permit

Zoning approval only tells your team where the house can sit—your manufactured home installation site plan coordinates how the unit connects to piers or permanent foundations, electric pedestals, LP gas tanks, water/septic yard lines, retaining walls, and exit landings without failing inspection halfway through setup.

Look at how fast installation details fracture between agencies when drawings aren't kept synchronized:

  • In Sonoma County, CA, the county's Placement of Manufactured Homes on Private Property policy draws a hard line between 4 sets of site plans for non-permanent support systems and HCD/plan-check real-property vs. personal-property foundation tracks when anchoring permanently.
  • In San Luis Obispo County, CA, installing on a permanent slab or stem wall activates both the Manufactured Home Permanent Foundation site plan gate and the broader Construction Permit Submittal Checklist (vicinity map, contours, footprints, easements, wells, septic, and building spacing).
  • In Nassau County, FL, setup packets must clear the MH Application Sufficiency Checklist—explicitly reviewing site prep, foundation, piers, anchoring, and skirting alongside septic and water clearance letters.
  • In Solano County, CA, reviewers require 4 drawing sets explicitly marking LP tanks, drainage, retaining walls, wells, septic systems, streams, and the drawing preparer's name (plus generator notes where backup power is added).
  • In Yavapai County, AZ, modifying your state installation permit mid-stream—adding an awning, shifting steps, or resizing a utility pad—can force a Revised Plot Plan back at the county alongside a \$150 county electric pedestal inspection.

Instead of waiting days on an outside CAD drafter every time a state inspector, installer, or utility company moves a line on site, build your master parcel project in our workspace and revise exported sheets in minutes.


Built for Repeat B2B Installation & Turnkey Setup Teams


Key Installation-Phase Elements Your Site Plan Must Coordinate

Installation ItemWhat Belongs on the DrawingWhy Inspectors Flag Omissions During Setup
Support System / Foundation TrackLabel clearly whether installing on non-permanent piers/blocking or a permanent foundationDetermines whether county pier checklists or permanent real-property plan checks apply (Sonoma, San Luis Obispo).
Steps, Landings, Porches & SkirtingExterior stairs, landings at every exit door, covered porches, and skirting/crawlspace accessInspectors compare field exits against the drawing; counties like La Paz require separate building permits for porches/ramadas.
Electric Pedestal & Power FeedNew or upgraded meter pedestal location + underground conduit routeCounties inspect electrical pedestals separately from state unit inspections (Yavapai County, AZ levies a dedicated pedestal inspection check).
LP Tanks, Generators & Fuel LinesAboveground/buried propane tank footprint, distances to openings/lot lines, standby generator padExplicit safety separations apply across California counties (Solano County, CA) and fuel inspectors reject unlabeled tanks.
Water, Septic & Yard-Line RoutingDomestic water trench, sewer/septic tie-in, cleanout path, and drainfield avoidance zoneEquipment or pier footings cannot cross septic tanks or leach trenches mapped earlier at zoning.
Site Grading, Retaining Walls & DrainageSwales, finished drainage arrows, retaining walls, and finished pad slopesNassau and Solano explicitly evaluate drainage paths and retaining walls alongside foundation sufficiency.
Preparer Name & Title BlockComplete preparer name/firm, parcel APN, site address, scale, and north arrowMandatory intake fields on multi-set California and Florida installation review packets.

Compare All 6 Manufactured, Modular & Mobile Site Plan Guides

Link your setup workflow cleanly between zoning placement, physical installation, and companion exterior scopes:

Housing CategoryInitial Lot / Zoning PageSetup & Execution PageCore Trigger Separating Placement vs. Installation
HUD Manufactured HomesManufactured Home Placement Site PlanManufactured Home Installation Site Plan (This Page)Placement proves setbacks & septic buffers; Installation tracks piers/foundations, utility lines, skirting & state tie-ins
Modular / FBB UnitsModular Home Placement Site PlanModular Home Installation Site PlanCoordinates perimeter foundation permits, room-labeled floor plans & post-set state close-out reports
Mobile & Ancillary UnitsMobile Home Placement Site PlanMobile Home Installation Site PlanCovers entry steps/landings, blocking/tie-downs, and dual Fire/Building ancillary location approvals

Stop Paying Twice When State or Setter Edits Trigger a Revised Plot Plan

Dealership permit desks hit the same wall repeatedly: a placement drawing gets approved in month one, then in month two the state setter needs to shift the unit four feet away from a septic cleanout, add a wider entry deck, or relocate a driveway gate—triggering a county Revised Plot Plan requirement.

  1. Maintain one master editable site project per customer parcel. Every dimension, setback, utility yard line, and title-block field stays saved inside your account from initial lot walk through final occupancy.
  2. Add contract accessories before submitting installation packets. Layer driveways, decks, LP tanks, and retaining walls cleanly on top of the approved unit box.
  3. Export multiple clean sets on demand. When a county like Solano or Sonoma asks for 4 identical sets with updated utility notes and preparer details, export and print directly from your title sheet without waiting on an outside CAD drafter.

Step-by-Step: Update & Export an Installation-Ready Site Plan

  1. Enter the job address or reopen your saved placement parcel. Load live parcel boundaries inside /#checker—or submit a new county address lookup to prioritize coverage activation while drafting directly via plat dimensions or SitePlans.us.
  2. Add accessory structures tied to setup. Place piers/foundation pad outlines, utility pedestals, LP/propane tanks, retaining walls, and detached garages or sheds accurately.
  3. Place decks, steps, and landings at every entrance. Verify exit projections don't encroach into side or rear setback lines before concrete or stringers are cut.
  4. Create the driveway and drainage path. Map heavy-truck delivery access alongside permanent culvert/apron geometry and yard-line clearances.
  5. Generate your title sheet and export PDF. Populate preparer name, dealership/contractor company info, installation scope notes (non-permanent vs. permanent foundation), and clean scale bars for 2-set or 4-set printing.

What This Doesn't Replace

Our drafting workspace creates preliminary, conceptual, permit-style site and plot plans tailored to dealers, builders, and licensed installers organizing lot geometry and agency coordination. It is not an engineered manufactured-home foundation design (such as HCD 433A permanent-foundation drawings or PE/architect-stamped stem-wall details), a state HUD/housing installation permit or licensed installer certification, a licensed land boundary survey, or a guarantee of installation pass/occupancy approval. Wherever states or counties require sealed pier/tie-down engineering, licensed electrical/plumbing plans, or PLS boundary surveys, those certified documents remain mandatory.


Comparing Installation Plot Plan Workflows

OptionMulti-Set Revision SpeedHandles Pedestals, Steps & Utility Yard Updates?Cost When Setter Shifts Box by 3 FeetTypical Cost
Licensed Surveyor / Civil2–5 weeksSlow change-order turnaroundHigh hourly re-draft fee\$1,200–\$3,500+
Outside CAD Drafter3–8 business daysQueue reset per state commentExtra invoice per revised PDF\$200–\$500 / lot
SitePlans.ai (In-House Workspace)10 minutesYes — edit once, re-export sets immediately\$0 extra inside monthly exports\$13.80–\$49 / plan
SitePlans.us (Done-For-You)Fast human turnaroundDrafted cleanly by human teamScoped per projectPer-project flat rate

Pricing Built for Contractors, Builders & Multi-Lot Home Dealers

PlanPriceUnit CostBest ForWhat You Get
Single Site Plan\$49\$49.00 / planOne-off permit job1 saved project, up to 3 address lookups, up to 5 PDF exports (includes redline edits), Letter landscape title sheet, editable title block
Contractor Pro\$69/mo\$13.80 / plan (5/mo)General contractors & trade installersUp to 20 address lookups/mo, up to 5 site plan exports/mo, company name on title block, full setback/ROW/structure layers
Builder Plus\$299/mo\$29.90 / plan (10/mo)Custom, infill & modular buildersUp to 30 address lookups/mo, up to 10 site plan exports/mo, full company branding, Letter/A3/A4/A1 sheets (landscape & portrait)
Home Dealer / Retailer\$499/mo\$24.95 / plan (20/mo)Manufactured, modular & mobile dealershipsUp to 50 address lookups/mo for sales-desk lot checks, up to 20 site plan exports/mo, dealership branding, multi-sheet sizes, fast revised plot plans
Done-For-YouFrom SitePlans.usPer-project flat rateComplex parcels or overflow draftingHuman-reviewed, non-certified permit-style site plan

For Enterprise deals contact sales@siteplans.ai


Key County Markets With Documented Installation & Foundation Splits

  • Sonoma County, CA — Non-permanent support 4-set site plans vs. permanent foundation HCD real-property plan check.
  • San Luis Obispo County, CA — Permanent Foundation site plan route plus full residential construction submittal checklist.
  • Solano County, CA — 4 drawing sets requiring LP tanks, drainage, retaining walls, streams, wells, septic, and preparer names.
  • Nassau County, FL — MH Application Sufficiency Checklist covering site prep, piers, anchoring, skirting, and septic/water letters.
  • Yavapai County, AZ — County electric-pedestal inspection ($150) + Revised Plot Plan requirement on state installation edits.
  • Coconino County, AZ — Forwarding the post-set state installation inspection report to close county zoning permits.

Where to Verify State & County Rules After Your Site Plan Is Exported

Once your updated installation site plan aligns with field engineering and setup specs, verify federal installation standards and confirm final submittal portals with your county and state housing department:

  • HUD Installation Standards Overview: U.S. Department of Housing and Urban Development — Manufactured Home Installation Program ( hud.gov Installation Program ).
  • County & State Filing Portals: Consult the individual county guides linked above before uploading revised plot plans, electric pedestal requests, or state inspection close-out forms.

Frequently Asked Questions

1. Why isn't a zoning placement site plan always enough for final manufactured home installation?

Placement plans confirm lot lines and zoning setbacks, whereas installation review checks physical setup items—foundation vs. pier system choice, steps and landings, LP tank offsets, electric pedestal location, retaining walls, drainage, and utility yard routing.

2. What changes on a site plan when switching from non-permanent piers to a permanent foundation?

Jurisdictions like Sonoma County, CA and San Luis Obispo County, CA switch review tracks—triggering formal foundation plan check, permanent anchorage calculations, and real-property titling requirements alongside construction-grade site details like contours and drainage.

3. How do counties like Yavapai County handle revisions made during state installation permitting?

Modifying a state installation permit in Yavapai County, AZ (such as shifting a porch, awning, or unit box) explicitly flags that a Revised Plot Plan or additional county permit may be required before inspections proceed.

4. Must electric pedestals, LP gas tanks, and generators be drawn on installation site plans?

Yes. Counties like Yavapai County, AZ inspect new or upgraded electric pedestals directly, while Solano County, CA checks LP tanks, retaining walls, and backup generator placements on multi-set plot plans.

5. Are steps, porches, and exterior landings included under the HUD installation permit everywhere?

No. While some states cover contract awnings/steps under state installation scope, counties such as La Paz County, AZ require a separate county building permit for masonry/wood foundations, porches, awnings, and ramadas—and Mohave County, AZ insists every step and landing be drawn on the plot plan.

6. How does SitePlans.ai help when a county requires 4 hardcopy drawing sets?

California counties like Sonoma and Solano request 4 identical sets of drawings with preparer details clearly shown. Exporting a sharp, layered PDF with editable title sheet fields makes printing matching sets straightforward.

7. Does our saved project carry forward from initial placement check into installation edits?

Yes. Instead of paying an outside drafter twice, dealers open the original parcel file, add decks, utilities, or shifted dimensions, and export updated installation sheets from the same project.

8. What should appear under "Preparer Name" in counties like Solano County?

Include the actual person or dealership/contractor firm preparing the preliminary plot plan on the editable title block—along with parcel APN, owner details, north arrow, and scale.

9. What happens if our installer needs a parcel lookup in a county pending parcel coverage?

Enter the lot address in /#checker to trigger rapid county parcel activation—in the meantime, draft directly using survey dimensions or delegate to our team at SitePlans.us.

10. Does SitePlans.ai provide PE-stamped foundation or tie-down plans?

No. Engineered permanent-foundation drawings (such as HCD 433A sheets), soil/pier engineering, and licensed installer certifications must come from qualified engineers and licensed setup contractors.

11. Which pricing plan fits a high-volume setup crew coordinating installation edits across multiple counties?

The Home Dealer / Retailer plan (\$499/mo) offers 50 monthly parcel lookups and 20 site plan exports per month (\$24.95/plan) with dealership branding and multi-size PDF outputs (Letter, A3, A4, A1).

12. Can independent set contractors use a smaller tier just for plot plan updates and exterior decks?

Yes—Contractor Pro (\$69/mo) gives contractors 20 monthly lookups and 5 exported PDF plans/mo (\$13.80/plan) with company branding and full setback, ROW, and structure layers.


Keep Placement, Utilities, and Set Inspections on One Clean Sheet

Adjust footprints, utility yards, and landing offsets in minutes—before inspectors stall your setup crew.