Dallas GA Requires a Site Plan That Shows Parking, Landscaping, and Elevations — Not Just Property Lines

Dallas is the county seat of Paulding County, located northwest of Atlanta. Its Community Development Department uses the **Tyler EnerGov Customer Self Service (CSS)** portal for permit applications — so if you've used EnerGov in another Georgia city, the workflow will feel familiar. The site plan requirement in Dallas is notably broader than most residential permit drawings. Beyond the usual property lines and setbacks, Dallas explicitly requires the plan to show **parking layout**, **landscaping**, **floor plans**, and **building elevations** alongside the site footprint. This reflects Dallas reviewing projects with zoning and site character in mind — not just structural setback compliance. Two hard copies are required for every submittal: one for city records, one to stay on the job site for inspections. Digital submission through EnerGov is available for review prior to final approval.

Jump To The Permit Details That Matter

Dallas GA requires site plans showing all property lines, structures, parking layout, landscaping areas, floor plans, and elevations. Two hard copies required — one stays on site for inspections. Minimum permit fee \$100; valuation-based fees apply at \$5 per \$1,000 up to \$500,000. Apply through Tyler EnerGov CSS portal or email melgaydi@dallas-ga.gov. Owner-builders allowed on owner-occupied single-family homes. Building codes: 2024 IBC/IRC with Georgia amendments effective January 1, 2026.

# Dallas GA Requires a Site Plan That Shows Parking, Landscaping, and Elevations — Not Just Property Lines

Most residential permit drawings focus on three things: property lines, setbacks, and the proposed footprint. Dallas's Community Development Department adds three more: parking layout, landscaping, and building elevations. This makes the Dallas site plan requirement closer to a commercial-style site plan than the typical residential sketch most cities accept for a deck or garage permit.

Understanding why helps you get it right the first time. Dallas reviews projects with full site character in mind — not just whether a structure clears the setback lines. Add the required layers to your drawing before you submit to avoid an immediate correction letter.

---

What a Dallas Site Plan Must Show

Element Dallas Requirement
Property lines All boundaries clearly drawn and dimensioned
Existing structures All buildings, sheds, accessory structures on the lot
Proposed project Footprint, dimensions, use, location
Parking layout Parking spaces location and count
Landscaping Existing and proposed landscaping areas
Floor plans Building floor plan at appropriate scale
Building elevations All four elevations or as applicable to the project
Utilities Utility connections and drainage patterns
Scale Drawn to accurate scale; stated in title block
Title block Address, owner name, date, preparer

---

Dallas Submission Requirements

Requirement Details
Hard copies 2 required — one for city records, one stays on site
Digital submission Available for review prior to final approval
Portal Tyler EnerGov Customer Self Service (CSS)
Alternative submission Email to melgaydi@dallas-ga.gov
Minimum permit fee \$100
Valuation-based fee \$5 per \$1,000 of construction value (up to \$500,000)
Building codes 2024 IBC, IRC, IPC, IMC, IFGC, ISPSC, 2023 NEC — all with Georgia amendments
Code effective date January 1, 2026

---

Dallas Setbacks (Verify With City)

Yard Typical Requirement
Front yard Varies by zoning district
Interior side yard 25 feet minimum (verify — may be district-specific)
Corner lot side (street-facing) 25 feet
Rear yard Varies by zoning district

Contact the Community Development Department at (770) 443-8110 to confirm the exact setback requirements for your zoning district before drawing.

---

Who Can Pull a Dallas Permit

Property owners may act as their own general contractor for work on a single-family residence they own and occupy. This follows Georgia's owner-builder provision under state law.

Licensed contractors must submit: a valid Georgia state contractor license, city business license, and photo ID with their permit application.

Contractor records need to be on file with the city before a permit can be issued.

---

Project-by-Project Requirements

Project What Your Site Plan Needs Guide
Deck Lot lines, deck footprint + height, setbacks, parking, landscaping, elevations Permit required
Shed Lot lines, shed footprint, setbacks, site notes Permit required
Pool Lot lines, pool location, setbacks, barriers, parking, drainage Permit required
Garage Lot lines, garage footprint, driveway, parking count, setbacks, elevations Permit required
Fence Lot lines, fence line, height Verify with city
Addition Existing + new footprint, setbacks, parking, landscaping, elevations Permit required
Driveway Lot lines, driveway location, curb cut if applicable Right-of-way work requires permit

---

Submitting Through EnerGov

Dallas uses the Tyler EnerGov CSS portal for online permit submissions:

  1. Create or log into your EnerGov account at the Dallas portal
  2. Start a new permit application — select your project type
  3. Upload the site plan PDF, floor plans, elevations, and any supplemental documents
  4. Pay the applicable permit fee online
  5. Print or save the two required hard copies for job site and city submission if required beyond digital review

Track your review status and respond to correction requests through the EnerGov portal. For project-specific questions before submitting, call Community Development at (770) 443-8110 or email the application team.

---

Building Parking and Landscaping Into Your Site Plan

Parking: For most single-family residential projects, the parking requirement is straightforward — show the driveway, garage spaces, and any off-street parking. Label each space and show total count. For additions or projects that change the site layout, Dallas expects to see that parking access and count are maintained.

Landscaping: You don't need a detailed landscape architecture plan for a standard residential permit — but show existing trees, lawn areas, and any proposed landscaping changes relative to the project. For a deck or garage, note what happens to the landscaping in the area being developed.

Building elevations: Attach the exterior elevation drawings showing all sides of the proposed structure. For decks, a simple elevation showing height above grade is typically sufficient. For full additions or garages, all four elevations.

---

Building Your Dallas Site Plan

  1. Enter your Dallas address. Paulding County parcel data loads — lot boundaries and dimensions pull from county records.
  2. Place your project. Setback lines generate from the boundaries. Verify all setback distances are labeled.
  3. Add parking notation. Label driveway and parking spaces on the drawing.
  4. Note landscaping areas. Identify existing lawn/landscaping areas relative to the project footprint.
  5. Attach elevations. Prepare or attach elevation drawings for the proposed structure.
  6. Print two hard copies. One for city records, one for the job site.

See how to edit your title sheet to add owner name, project notes, and date before export.

---

What This Doesn't Replace

The site plan creator generates preliminary, conceptual drawings for residential permit applications where Dallas allows homeowner-prepared plans. It is not a licensed land survey, a certified engineering document, or a formal landscape architecture plan. Building elevations and floor plans must be prepared separately and attached to the site plan package. Final permit approval is at the sole discretion of the City of Dallas Community Development Department.

---

Local Resources

---

Nearby Cities

---

Frequently Asked Questions

1. Does every residential permit in Dallas require parking shown on the site plan?

Yes — Dallas's site plan requirements list parking as a required element. For residential projects, this typically means showing driveway and garage spaces with their location and count labeled on the drawing.

2. Why does Dallas require landscaping on a residential site plan?

Dallas reviews projects for site character and zoning compliance, not just setback clearances. Showing existing and proposed landscaping areas relative to the project helps the reviewer confirm that the lot's character is maintained and that site drainage areas aren't being eliminated.

3. Do I need architectural floor plans for a residential deck permit?

Dallas lists floor plans as a required site plan element. For a deck, this typically means showing the deck layout and dimensions at a floor plan scale — not the entire house floor plan. Contact Community Development to confirm the level of detail required for your specific project.

4. How many copies of plans do I need?

Two hard copies: one for city records and one to remain on the job site for inspections. Digital submission through EnerGov is available for review prior to final approval.

5. Can I submit my Dallas permit application online?

Yes — through the Tyler EnerGov Customer Self Service (CSS) portal. You can also email the application package to melgaydi@dallas-ga.gov. The EnerGov portal is the preferred method for tracking review status.

6. Can a homeowner pull their own permit in Dallas?

Yes — property owners may act as their own general contractor on a single-family residence they own and occupy, per Georgia's owner-builder law. Licensed trade work still requires licensed contractors and separate trade permits.

7. What is the minimum permit fee in Dallas?

\$100 minimum. Valuation-based fees apply at \$5 per \$1,000 of construction value up to \$500,000. Contact Community Development for the current full fee schedule.

8. Which building codes does Dallas enforce?

Dallas enforces the 2024 International Building Code (IBC), 2024 IRC, 2024 IPC, 2024 IMC, 2024 IFGC, 2024 ISPSC, and 2023 NEC — all with Georgia Department of Community Affairs amendments. Effective January 1, 2026.

9. How long does permit review take in Dallas?

Simple permits are typically issued within a few business days. Georgia state law allows up to 30 business days for review. Submit a complete application on the first pass to avoid restarting the clock.

10. How do I verify my property is within Dallas city limits?

Check the Paulding County GIS portal to confirm your parcel's jurisdiction. Dallas's Community Development Department instructs applicants to verify jurisdiction before submitting — the city cannot issue permits for properties outside city limits.

---

Start Your Dallas Site Plan

Two hard copies. Parking labeled. Landscaping noted. Property lines from Paulding County parcel data. Enter your address, build the site plan, attach your elevations, and submit through EnerGov. First plan is free.