San Bernardino County ADU Site Plan: LUS Plot Rules, Permit Fees & Fire Gates

ADU builders, design-build remodelers, and general contractors working across Big Bear, Apple Valley, Hesperia, Yucca Valley, and unincorporated Inland Empire lots know that San Bernardino County Land Use Services (LUS) only asks for one complete plan set—not three. Even so, ADU submittals stall when a plot plan shows an APN without the deed legal description, misses a Very High Fire Hazard Severity Zone clearance, or miscalculates the 750 sq ft state impact-fee threshold. Load your client's parcel into SitePlans.ai, lay out the ADU footprint and setbacks to scale, and export a clean plot plan ready for the LUS Online Portal.

San Bernardino County ADU site plan showing property lines, existing house, detached ADU footprint, setbacks, off-street parking, and fire hazard notation
A dimensioned preliminary ADU plot plan prepared for unincorporated San Bernardino County LUS Online Portal submittal, including setbacks, easements, parking, and legal description block.

Jump To The Permit Details That Matter

In unincorporated San Bernardino County, California, ADU permits are processed by Land Use Services (LUS) — Building and Safety through the LUS Online Portal, which requires one complete set of plans. Every San Bernardino County ADU site plan must be a fully dimensioned plot plan showing all property lines, setbacks, existing and proposed structures (detached ADUs up to 1,200 sq ft), easements, off-street parking, streets and driveways, flood zone boundaries if applicable, North arrow, scale, title block, and the formal legal description from the deed or title (an APN alone is not accepted). LUS calculates plan review and building permit fees by square footage, attached or detached scope, and construction valuation under its Building and Safety Division Fee Schedule, while California Government Code § 66311.5 exempts ADUs under 750 sq ft from local development impact fees and scales fees proportionally at 750 sq ft or larger. Projects in Very High Fire Hazard Severity Zones require Fire Department approval before LUS issues the building permit, and FEMA flood zones require a separate floodplain permit. SitePlans.ai lets ADU builders generate preliminary plot plans in minutes ($49 per plan or $69/mo Contractor Pro); it does not replace a licensed California land survey or PE/architect stamp where required.

San Bernardino County ADU Site Plan: LUS Plot Rules, Permit Fees & Fire Gates

Load a Job Address → Order a Done-For-You Plan →


Why ADU Builders Need Fast, Site-Specific Plot Plans in San Bernardino County

Across unincorporated San Bernardino County, Land Use Services (LUS) lets builders submit one complete plan set digitally through the LUS Online Portal, and even provides Pre-Approved Detached ADU Plans (such as Models B, C, and D) to cut architectural turnaround. Even when you use a pre-approved floor plan, however, you still need a site-specific, fully dimensioned San Bernardino County ADU site plan tailored to that exact lot.

Waiting on an outside drafter for every backyard ADU quote slows down client sign-offs and delays portal intake. With SitePlans.ai, your team enters the job address, loads parcel boundaries in covered areas, places the ADU footprint with setback dimensions, and exports a clean PDF ready to pair with your architectural sheets.


San Bernardino County ADU Permit Fees & Impact Fee Rules

Builders budgeting an unincorporated ADU job need to separate LUS plan check/building permit fees from local development impact fees:

  • Plan Review & Building Permit Fees: Rather than a single flat ADU price, LUS calculates plan review, building permit, and inspection fees using project square footage, attached vs. detached scope, and construction valuation under the Building and Safety Division Fee Schedule, plus standard state building standards, technology, and archive surcharges.
  • Under 750 sq ft Impact Fee Exemption: Under California Government Code § 66311.5, ADUs under 750 sq ft are exempt from local development impact fees.
  • 750 sq ft or Larger Impact Fees: For ADUs 750 sq ft or larger, local impact fees (such as regional transportation fees) are scaled proportionally relative to the square footage of the primary dwelling.
  • Pre-Approved ADU Cost Advantage: Selecting one of the county's pre-approved detached ADU models reduces custom design and engineering expenses while still requiring a site-specific plot plan for the lot.

Exact fee totals depend on parcel location, utility connections, and current county fee tables. Always run the LUS EZ Online Permitting fee estimator or contact LUS Planning at (909) 387-8311 before locking final client budgets.


What LUS Requires on Every ADU Plot Plan

To clear initial Building and Safety intake without a correction notice, your plot plan must display:

Plot Plan ElementLUS RequirementCommon Builder Mistake
Property linesAll lot lines with exact dimensionsCropping deep desert or mountain lots so rear lines disappear.
Legal descriptionFull legal description from the recorded deed or titleListing only the APN from a tax bill—LUS requires the deed legal description.
Existing & proposed structuresMain house, garage, sheds, and proposed ADU with dimensionsOmitting existing detached sheds or patio covers when calculating lot layout.
SetbacksMeasured distances from ADU walls to property lines and main dwellingForgetting fire separation distances or front-facing garage 18-ft rules.
Easements & parkingRecorded utility/drainage easements plus off-street parking spacesLeaving off replacement parking or driveway access paths.
Hazard & orientation blocksFlood zone boundary (if mapped), North arrow, scale, title block, and signatureMissing owner or authorized agent signature block on submittal PDF.

Three Jurisdiction and Hazard Traps That Stall ADU Permits

  1. The 24-City Jurisdiction Split: Fontana, Ontario, Rancho Cucamonga, Victorville, Hesperia, Redlands, Big Bear Lake, and 17 other incorporated cities run their own building departments. A Big Bear or Fontana mailing address does not guarantee county jurisdiction—check gis.sbcounty.gov before preparing your submittal.
  2. Sequential Fire Department Sign-Offs: Large parts of mountain and desert-fringe unincorporated territory fall inside High or Very High Fire Hazard Severity Zones (VHFHSZ). In these zones, Fire Department approval is required before LUS will issue the building permit—it is a sequential prerequisite, not a parallel review.
  3. FEMA Floodplain Permits: Parcels crossing desert washes or river channels in a FEMA Special Flood Hazard Area require a dedicated floodplain permit prior to building permit issuance.

How ADU Contractors Use SitePlans.ai on Every Lot

  1. Enter the lot address to load parcel boundaries in covered areas and confirm lot geometry in minutes. If parcel lines do not appear for a remote tract, request priority coverage before quoting.
  2. Trace the existing house and driveway so your estimator can test 749 sq ft vs. 900 sq ft ADU placements cleanly on the lot.
  3. Drop the proposed ADU footprint and dimension setbacks to side, rear, and front property lines plus distance to the primary residence.
  4. Add the title block and deed legal description, then export a scaled PDF to bundle with your pre-approved or custom ADU construction drawings.

Pricing for ADU Builders and Remodelers

PlanBest ForWhat You Get
Single Plan ($49)One-off ADU feasibility or submittalFull plot plan editing and PDF export for one parcel.
Contractor Pro ($69/mo)Repeat ADU and remodeling contractorsUnlimited edits as clients adjust ADU size/placement, plus branded title blocks.
Builder Plus ($299/mo)Multi-project ADU buildersTeam-scale lot workflows across multiple active county jobs.
Done-For-You (SitePlans.us)Busy field teamsHuman-reviewed, non-certified preliminary plot plans prepared by our drafting team.

What SitePlans.ai Does Not Replace

SitePlans.ai helps ADU builders and contractors create preliminary, permit-style site plans where local rules allow contractor- or owner-prepared plot drawings. It is not a licensed California land survey, PE/architectural stamp, Title 24 energy compliance package, or a guarantee of permit approval. Where a lot requires a licensed boundary survey, grading engineering, septic percolation design, or Fire Department engineered turnaround plans, qualified licensed professionals must still provide those deliverables.


Official San Bernardino County Resources

Confirm parcel jurisdiction, fire hazard zones, and current fee schedules directly with these official agencies:

Frequently asked questions

How much are ADU permit fees in unincorporated San Bernardino County?

LUS does not charge a single flat ADU fee; plan check and building permit fees depend on square footage, attached vs. detached scope, and construction valuation under the Building and Safety Division Fee Schedule. Under California Government Code § 66311.5, ADUs under 750 sq ft are exempt from local development impact fees, while units 750 sq ft or larger pay proportional impact fees.

Can I use a San Bernardino County pre-approved ADU plan without a site plan?

No. Even when using a county pre-approved detached ADU model, you must submit a site-specific, fully dimensioned plot plan showing how the ADU fits on your client's parcel, including setbacks, easements, parking, and the deed legal description.

How many plan sets does San Bernardino County LUS require?

LUS requires one complete set of plans for residential building permits, submitted digitally through the LUS Online Portal.

What happens if the ADU parcel is in a Very High Fire Hazard Severity Zone?

Projects in a Very High Fire Hazard Severity Zone require Fire Department approval before LUS will issue the building permit. Check fire hazard status on county GIS early so your project schedule accounts for sequential Fire Department review.